  • Moving In–Ten Years After

    While this post is NOT about the circa 1970 British blues/rock band Ten Years After, it is about moving in and ten years after. I’ll answer the question, “After what?” a little later.

    The last three weeks have been, well, chaotic. As I wrote last time, I was moving from the old house to the new one the way Johnny Cash built his Cadillac: “One piece at a time.” Which is a lot harder to do than it might seem. At least, it was for me. Not harder physically, although there was plenty of toting and hauling. In fact, with apologies to Ned Washington and Dimitri Tiomkin, I came up with my own version of the Rawhide theme:

    Movin’, movin’, movin’,

    Keep them boxes movin’,

    Movin’, movin’, movin’,

    Boxhide.

    Pack ’em up, move ’em out, move ’em in, pack ’em out,

    Pack ’em in,

    Boxhiiiiide. Yaah!

    OK, great poetry/song lyrics they’re not. I still felt rode hard and put away wet a lot of days.

    And then there was the delivery of all the new furniture and laundry equipment that extended over a two week period, maybe longer than that, and included some stuff not being delivered because it showed up at my interior designer’s warehouse, or at my house, broken. Not all of that has been resolved yet.

    And then there’s that 10 year thing. And the 18 year thing. And the 23 year thing. You see, it’s been 10 years since I last moved–to the house I’ve now left and which I HATED for the first two years I was in it. Ten years is the longest time I’ve lived in one house since I left home to go to college. When you’re in the military, you get used to moving every few years. There’s a kind of rhythm to it, even if the moves come at irregular intervals–after one year at one place, three years at the next, four years after that, and so on. To go ten years without moving almost never happens. You may move back to the same place several times, as I did, but not stay there for a full, uninterrupted decade. But that’s what happened here.

    The 18 year thing is the fact that I bought the land the new house sits on 18 years ago, in 1998. And I first saw it 23 years ago, in 1993. So there’s been this tremendous build-up to getting the house designed, built, and moved into that I didn’t really recognize until it came time to move.

    And then it hit me.

    So for the past three weeks I haven’t had the mental energy to blog, which is why I’m only now writing this post.

    But the good news is that I’m now in, and with the help of good friends Ryan and Pam, got the last, biggest pieces of furniture and plants, including a ten foot tall yucca, moved a few days ago.

    And my first night in the new place came on August 28th, ten years to the day after my first night in the old house. (Yes, I looked up the date. I knew I was coming close to it and it wasn’t hard to find the exact date.)

    While all of this moving was going on, other things were happening too.

    Two of the things happened at the same time. I’ve written in the past about how I wasn’t thrilled with the tile backsplashes in the guest bathroom, so I asked the company that was cutting up the granite slab we used for the counter top to make some pieces as an alternative backsplash. They did and when they came down, while the pieces weren’t as close matches to the counter as I would have liked, I went ahead and had them put in. This is how part of the new pieces look now.

    Guest bath granite backsplash left

    At the same time, the guys brought down the slab that forms the top of the desk in my office. It includes a cutout for the uninterruptible power supply (UPS) for my computer but that had to be done on-site. The separate company that made the base of the desk had already created the cutout and box in the under-deck, so what was left was to cut the slot in the granite.

    Cutting the office desk top

    And waddayaknow? It fits!

    Office desk and bookcases

    (That pristine look didn’t last long. Now it looks like a working desk. Cluttered, in other words. )

    The other thing that happened was a test to support the LEED certification. (LEED stands for Leadership in Energy and Environmental Design. We’re going for a rating that says we’ve done a lot to conserve energy, water, building materials, etc. It’s the reason why every light bulb but one uses LEDs, for example.) This particular test, called a blower door test, checks to see how air-tight the house is. The way it works is, with all the doors but one and all the windows closed, a special door is put into the one open one.

    Blower door

    That big fan tries to suck air out of the house while special equipment measures how much is being pulled.

    Blower door test in progress

    The results for this test…

    Blower door test equipment

    …suggest this house was performing at the rate of a house half its size, in square foot terms, and probably even less given how high the ceilings are in many rooms and how big many of the windows are. This is all good, and since HVAC performance is a big part of the LEED rating, it bodes well for the house achieving the “platinum” rating we’re shooting for. I’m not sure when I’ll get the final news on whether or not we achieved it.

    So now my attention shifts from moving in to getting the place organized–the office is a mess, and there are still pictures to hang, more furniture to be purchased and/or delivered, bedding to buy, etc.–and getting the old house ready to go on the market. Those stresses are a lot easier to manage than the ones I’ve been dealing with, and I think friends will no longer be worried about my health.

    The new place already feels like home. And after 10, or 18, or 23 years, that’s a good thing.

     

    Save

    Save

    Save

  • Water You Doin’? Moving In

    Water You Doin’?

    The past two weeks I’ve been consumed with moving in and by the end of each day, I’ve been too pooped to blog. And then there was last Friday.

    I got to the house about mid-morning with another load of stuff, only to discover a sizable puddle of water on the dining room floor. Uh-oh! I hustled the box I was carrying into the office, and on the way discovered that the water extended into the powder bath on the other side of the dining room wall. Uh-oh! (Or something. I might have used stronger language.) (Sorry, no pictures. Not only did I not have a camera with me, I had other priorities than photography.)

    Luckily, the day before I’d brought over all the new towels I’d bought for the house, and it took every bath and hand towel in the house, plus a few washcloths to sop up the mess.

    Sort of.

    Even after the puddles were soaked up, the water kept coming. Uh-oh! And it looked like it was coming from either under the toilet or worse, from under the wall.

    Well, this is why builders carry insurance when they guarantee their work. “Houston” (or Bill), “we have a problem.”

    Bill called the plumber who installed all the piping. He was far away but made it to the house around 12:30. (Meanwhile, I’d unpacked the load I’d brought to the house and gone home for a quick lunch and more towels. What else could I do? Turns out there was something, but I didn’t think of it; it wasn’t obvious. More on that in a minute.)

    So the plumber checks everything he can think of (except the one thing he didn’t), and says, “I guess we’re going to have to open the wall to find out where the leak is.” Fortunately (we thought), while I was back at the old house, I’d looked through all of the photos I’ve taken while the house was being built and found ONE that showed where that cold-water line came down the wall. OK, that gives us a place to start.

    The plumber sawed out the first section of wall. Some of the drywall wasn’t so dry anymore, some was OK. But no leak.

    He cut out another section. Same thing. Yet the water’s still coming. Maybe, he said, a nail got into the PEX piping and has only now corroded enough to leak. He found every connection, and bared every bit of the piping below the top of the wet drywall.

    Nothing. Hmmm.

     

    Opened dining room wall

    “Oh, wait!” he said. He went into the bathroom, opened the cabinet doors, and found… you’re way ahead of me, right? The flash heater that feeds hot water to the sink was leaking. If I had thought to check that, I could have turned off the water to it and saved a little of the leakage. If he’d thought of it first–and he installed it–we might not have had to cut that big hole in the wall. In any case, he shut off the water to the heater, removed it, and will get a new one.

    Since then? Dry as a bone.

    So now the drywall will have to be repaired or replaced and the wall textured and repainted. And a big load of new furniture, including two buffets that are supposed to go against that wall, is supposed to be delivered on Tuesday.”Don’t worry,” says Terri, the interior designer in charge of the delivery and set-up, “we’ll work around it.”

    The good news, I guess, is that this happened now, before that furniture arrived. The wood cabinetry in the vanity is damaged and I expect it will have to be replaced. But that’s about it. And I’d been thinking about going to a meeting in Prescott, Arizona, a five hour drive north of here, on Friday. If I had, and hadn’t gone to the house until today… I shudder to think what I would have found.

    It’s Curtains for You

    Well, blinds, actually. The other big (and positive) news of the past two weeks was the installation of the “window treatments”–OK, OK, blinds–in the office and bedrooms.

    The blinds in the office roll down from the top. Like all of them, they’re translucent so that even when they’re down, some light gets in.

    Office blinds

    With them part-way down, you can really see the difference.

    The blind for the master bedroom is the only one covering a sliding glass door and one of only two that are singles and are not installed in a corner. Here’s a close-up of the material.

    Master bedroom blind close-up

    The “German” bedroom gets a material that looks like grass. Not exactly Germanic but the color’s right.

    German bedroom blinds close-up

    Because these windows face north and east, they also get black-out blinds behind them. They’re not perfect at blocking all light because they’re mounted in a corner, but they’ll do a good job.

    German bedroom blinds

    The blinds in the “Oriental” bedroom are a bit more in keeping with the color theme.

    Oriental bedroom blinds close-up

    And again they get black-out blinds, for the same reason.

    Oriental bedroom blinds

    I was going to write about how I’ve been moving in the way Johnny Cash built his Cadillac–“one piece at a time”–but since this post is getting long, I’ll save that for next time. My goal is to be living in the new place by the end of the week, even though the move won’t be complete by then. It’ll be close enough.

     

    Save

    Save

    Save

    Save

  • Mine! (Almost) All Mine!

    The last couple of weeks have been crazy busy as we finished out most of the last of the construction details, got the final inspections done, and finished all of the paperwork. All before the HOA’s July 31st deadline. While Bill and the subs continue to work on the items on the punch list, I closed on the mortgage on July 26th and the Certificate of Occupancy was issued on the 27th. The house is now officially mine! (Well, my trust’s actually.)

    Certificate of Occupancy

    GREAT! Now I can move in, right?

    Uh, not really. It would be nice to have some furniture, maybe. So on August 1st, the new beds were delivered–and I managed to have the queen and the two twins put in the wrong rooms. That made the “Oriental” guest bedroom look awfully small all of a sudden, and led me to discover that I’d ordered sheets that won’t match the themes of these two rooms. SIGH. OK, that can be fixed.

    Next up was getting the sofa and chairs for the great room delivered on the 2nd. The guys showed up from Phoenix in a driving rainstorm but were able to back the truck up close to the west patio doors and get everything in without getting it wet.

    Great room sofa and chairs

    Next up were Paul and Celia Sislow, owners of CopperAnza in Tucson, and their two sons, delivering the coffee table you see above and the dining room table.

    Sislows and dining room table

    The coffee table will have a glass top like the dining room table. We left it in its packaging because the table is going to have to be moved so my big Turkish carpet can go underneath it. The frames of both tables are steel–and heavy–and the glass tops are heavy too.

    Dining and great rooms

    OK, so where are the chairs? Well, they’re not due to be delivered, along with two buffet tables which will go against the wall, until the 23rd, along with the rest of the furniture for the bedrooms. So my plans for moving in by the middle of the month? Not happenin’.

    Later this week, the desk for the office will be delivered. That should be really amazing. I’m nervous to see how it came out, since it was custom built in Tucson and all I’ve seen are the plans and the template for the granite top.

    There is one piece of good news here, though. I’ve been wondering how I was going to get everything that I do plan to move from the current house to the new one. A friend and former neighbor has offered his father-in-law’s enclosed trailer (and the truck to pull it), but why should I wait when there’s a lot of small stuff I can move before we need the trailer? So the move is going to happen kind-of the way Johnny Cash built his Cadillac: “One Piece at a Time.” This afternoon I stuffed six boxes of books, plus one other box, in the Bimmer and schlepped them down to the house. I can get a lot done if I make it a practice to fill the car every time I have to go to the house.

    Internet

    One of the things this move is forcing me to do is get a new internet service provider. The cable company I’ve been using for the last 20 years doesn’t provide service in Wild Horse, so my choices are either DSL or an over-the-air link. DSL data rates aren’t the greatest, and I’d gotten positive reviews about some of the broadcast providers, so I had one of them come down and install their system. Here’s Ben installing the antenna.

    Ben and the antenna

    Yes, it’s that small. The transmission tower it links to is about a mile and a half away. Inside I’ll have my own little Wi-Fi network.

    Rainstorm

    I mentioned earlier the driving Monsoon rain that was a problem for the first furniture delivery. Before those guys showed up, though, it was even stronger. So strong, in fact, that the wash below the house ran for the first time that I’ve seen. Not a surprise since I’d bet we got between 3″ and 4″ of rain just from that storm.

    The rattling you hear is the rain falling on the metal roof.

    If I can get moved in by Labor Day, I’ll have been in my current house for almost exactly ten years… when I originally expected to be here for only two.

    Save

    Save

  • Mirrors, Floors, and Tile

    As I expected, this past week has been a busy one as construction work wraps up. The mirrors went in, the last of the bamboo flooring went down, and almost the last of the tile backsplashes went in.

    Mirrors

    Mirror-maker Mo was back on Tuesday with the mirrors for the master and guest baths, plus a repaired antique mirror that will go in the master bedroom. He uses this way-cool laser device that guarantees a level mirror.

    Laser level

    Once he locates the horizontal and vertical centers on the wall, he uses the laser to show them along the full width of the space. By raising or lowering the height of the horizontal laser line, he can identify exactly where the mounting holes should go.

    Leveling using the laser

    And the end results are…

    Master bath mirror

    …in the master bath, and…

    Guest bath mirror

    …in the guest bath.

    Office floor

    Kurtis is back from vacation, and so we kept him busy, first with the floor for the office. Here he is laying down the glue for one of the final runs of the boards.

    Laying the office floor

    There’s too much glare coming from the windows to get a good idea of the color. This is a better image of the whole floor.

    Office floor

    Those white holes are openings for electrical outlets, which have now been installed. Their dark brown covers match the floor almost perfectly.

    This floor had to be glued down because the boards were not built to snap together the way the ones in the bedrooms were. The glue also serves as a vapor barrier from the concrete below, and there’s no need for that padding under the bamboo that we had to use in the bedrooms.

    Backsplashes

    Kurtis also installed the tile backsplashes in the kitchen. Here’s the backsplash above the cooktop under the overhead lights.

    Main kitchen backsplash

    And here’s the backsplash under a little side area with the under-cabinet lighting turned on.

    Side back-splash

    You can also see, right under the upper cabinets, the power and switch bar. By placing all of those controls up there, we didn’t have to worry about cutting tile to fit around the switches or outlets. If I want, I can add other things, like a clip to hold–and power–a phone or tablet, a USB port, or other things into the conduit with little effort. It’s almost “plug-and-play.”

    Monsoon storms

    Finally, July is one of our monsoon months, and that can mean some pretty stout storms. As I was leaving the house on Thursday, this storm was doing its thing out on the far side of the San Pedro Valley.

    Monsoon storm

    For reference, the Mule Mountains off in the distance just behind the storm are 13 miles away.

    There’s more wrap-up work to do but I’m expecting the final inspections to also be done this week and the county to issue the Certificate of Occupancy. I’ll close on the mortgage in early August and soon after that it’ll be time to move in.

     

     

    Save

    Save

    Save

  • New Home: A Quiet Week Before the Final Push

    Not much has happened this week. With the bamboo for the office floor needing the week to acclimate, tile and flooring setter Kurtis took the week off. Pretty much everything else depends on that floor getting done. The final push to finish everything will resume on Monday.

    “Monsoon” has arrived in this part of Arizona, though, which is a good thing. This literally is a monsoon–which just means a change of the prevailing wind direction–in our case from west or southwest to southeast. With the monsoon comes lots of moisture all the way from the Gulf of Mexico, which means thunderstorms and the bulk of our average 14″ of annual rain. The storms tend to be very spotty: raining like crazy at one spot, bone dry five miles away.

    Saturday was a good rain day, with 0.6″ delivered between two storms. And between those two storms, this rainbow, seen from the front door of my current house.

    Rainbow3

    The only other happening this week is part of the continuing saga of our local electric utility, the Sulphur Springs Valley Electric Cooperative (SSVEC) and their ongoing efforts to drive the rooftop solar industry out of their service area, while punishing those of us who have installed such systems already–with their (the co-op’s) past encouragement and financial help!–by quintupling one of the key rates they charge us. Back in May I testified at a hearing on SSVEC’s “rate case” (their request to raise rates) before an administrative law judge. Today (Sunday) and next Sunday I’ve had and will have a pair of op-ed pieces published in the local paper. Here’s the link to the first one. They’re playing a really nasty game of trying to make us (3% of their residential customer base) the villains while they try to raise all of their residential customers’ rates.

    Ultimately the Arizona Corporation Commission will decide whether SSVEC gets a rate increase, and if so, how much it will be, but I just couldn’t stand by while they, their CEO in particular, repeatedly slime us.

    We should know how all of this is going to play out before the end of the year.

    Save

    Save

    Save

  • Into the Home Stretch–Mirrors, Floors, and More

    We’re getting into the home stretch–no pun intended: the whole process of building this home has been a stretch! While there’s been some touch-up painting done this week, the biggest news has been regarding the floors.

    I’ve written before about how there was moisture coming up through the concrete in one of the guest bedrooms, the master bedroom, and the office. Not a lot, but enough in a couple of the rooms to be “out of tolerances” for the bamboo flooring we wanted to put in. The final decision was to lay down a sealer coat on the concrete and put in a whole-house humidifier, since bamboo is so sensitive to humidity, or the lack of it. Ironically, I’d asked about this when I’d first met the HVAC contractors, and at the time (not knowing what the flooring was going to be) they’d said it wasn’t needed.

    The unit isn’t very big. This is the tank that feeds the steam generator that feeds the air handler that pushes the air out throughout the rest of the house.

    Whole-house humidifier

    With that in place, the bamboo could go down in the master bedroom…

    Master bedroom floor

    and the guest bedroom…

    Guest bedroom floor

    …and the bamboo for the office could come out of its boxes and start “acclimating” there.

    Office flooring "acclimating"

    Sometime last week, or maybe even the week before, Kurtis had put a sealant on the slate flooring and accent pieces in the master bath. This is what the flooring looked like before the sealant (and the grout) were applied…

    Master bath tile

    …and this is what it looks like afterwards.

    Master bath slate post-sealer

    Hard to believe it’s the same floor! Edith and Kurtis told me the colors would “pop,” but wow!

    Besides the humidifier, one other plumbing-related system went in this week: a water treatment system. The neighborhood is served by a water company’s system, but the water is still very hard. The same company provides the water to my current house and I have calcium build-up everywhere.

    I really don’t like water “softening” systems, especially for the way the water feels and all the salt that would have to go into my septic tank, so I asked my plumber for other options. He proposed two: one called EasyWater, the other used to go by the Pelican brand name. Both treat the water so the calcium crystals won’t adhere to each other and to the surfaces of pipes and fixtures. EasyWater does it electronically, Pelican by running the water through a filter. Both, Dan said, work equally well (he has both at his house) but since the Pelican system was a few hundred dollars less, I went with it.

    Pelican system tanks

    (One of the fittings for the right-hand tank was leaking when I took the picture. It’s fine now.)

    I mentioned mirrors in the title, so I guess I’d better say something about them. On Thursday, I spent the afternoon in Tucson with Edith, looking at the remaining granite for possible use in the guest bath, checking out patio furniture (more on that in a minute), and talking with her mirror supplier, since I need mirrors in the master and guest baths. We looked at glass styles (beveled or not, and how much) and frames.

    Frames need to be picked where they’re going to be installed, so on Friday Mo brought a bunch down to compare while he also took field measurements. I made my selections and they should be ready in a couple of weeks. Mo also took with him an antique oval mirror I’ve had for ages to fix some of the decorative woodwork at the top. I’m planning on putting this mirror above the dresser in the master bedroom.

    Like the mirror frames, the cloth colors and patterns for the patio furniture should be selected on-site. Edith stopped by today so we could do that. We were standing in the kitchen, just about done, when she said, “There’s a bug or something on your shirt.” It was near the collar on the left side, where I couldn’t really see it, so, modern technology being what it is, she took a picture of it with her phone and showed it to me.

    Wasp!

    OK, now what, coach?

    It walked up the rest of the shirt and onto my neck. This could get interesting.

    Edith was close to freaking out. I decided to calmly and gently walk out onto the west patio and see if we (I) could encourage it to go elsewhere. A breeze blew it down onto my sleeve, and from there I was able to get it to walk onto a piece of paper, after which it flew away. My birthday present was not getting stung. I’ll take that!

    What’s on the agenda for this week? I’m not really sure. Kurtis is on vacation while the office flooring “acclimates,” so no other tile work will be done either. The bases for dining room table are being built down in Tucson, but they won’t come down until all of the other furniture does. Edith can get Paul working on the bases for the other tables for the patios, and the granite cut for their tops. Mo’s working on the mirrors. Maybe some more touch-up painting. I’m sure Bill’s got some things in mind.

    Save

    Save

    Save

    Save

    Save

  • Makin’ the Shade

    It’s been a long time coming but the shade over the south patio finally got installed on Thursday and Friday. This was the last major thing to be done on the exterior of the house. (Some of the cabling for the railing on that patio still needs to be run–more on that later–but by comparison, that’s a small thing.) So what does it look like?

    Let’s go back and take a look at the big hole that was. This was one side…

    South patio slat support beam

    And this was the other.

    South patio support beam east side

    (It’s harder taking a picture of a hole than you might think! )

    With that portion of the roof wide open, the patio below was very bright.

    Nearly finished south patio

    But now that the slats are in, things are A LOT different. This photo captures how different they appear, even though they’re all installed at the same angle relative to horizontal. It does a good job of showing how they’ll let some light in on an angle while blocking the more intense light from straight overhead, which is especially important now.

    South patio roof slats installed

    Seen from the great room, you can see how much more shaded the patio is now, yet light will still come in.

    South patio shade beams from inside

    I even got a little artistic, catching the reflection of the beams from the great room windows, while looking through the windows to a cloud visible through the windows on the other side of the house.

    South patio beams reflected in windows

    In short, this covering is going to make the patio much more usable during the summer or during the middle of the day at any time of the year. (They might even get us a LEED “innovation” point because they’re angled to bring in winter sunlight while blocking summer sun.)

    Earlier I mentioned the cable railing for the south patio. Here’s a close-up.

    South patio cable railing

    The cables provide the right combination of safety–the ground is as much as six feed down!–and visibility.

    In other news, most of the right wall switches and cover plates are now in (only the 4-way switches have yet to be installed). We’ve gone from this…

    Switch plate

    …ugh. Seriously? To this….

    Correct switches

    MUCH better!

    And speaking of covers, the cover for the kitchen vent hood exhaust pipe is now in place.

    Vent hood cover

    That looks much better too. I’m hoping this week the tile will go up on the wall below the hood and cabinets. Then the lighting for the counter tops can be mounted under the cabinets and the kitchen will be close to done.

     

    Save

    Save

    Save

    Save

  • Out With the Old (Vigas and Beams)

    One task that might not seem obvious at first when it comes to building a new home, green or otherwise, is deciding what to do with the old place. For me, that’s been an easy decision with this house: sell it! I HATED this house for the first couple years I was in it–a long, sad story I don’t need to repeat–and yet, to my amazement, I’ve now been here for almost 10 years, longer in one continuous stretch than any other location in my adult life! But before it can go on the market, certain things need to be fixed, especially the rotting exposed wood “vigas” and beams.

    The current house is a Santa Fe-style place, which means it has a flat roof, parapet walls, and these round wooden things sticking out of the walls that are supposed to look like the tree trunks “Native” peoples used to support the roofs and upper floors in pueblo-style homes. Those things are called vigas, and if they’re real wood (plastic ones are now available), between the heat and dryness we experience here most of the year, and the Monsoon rains we get mostly in July and August, they’re vulnerable to splitting and rotting over time. Actually, all exposed wood is vulnerable to this, even if it’s painted.

    I had the vigas replaced when the exterior was painted about eight years ago, but that’s enough time for them to fail again. Plus, two wooden beams, one facing south, one facing west, on one of my patios were succumbing to the same problems. How bad were they? Well, a 6″ X 10″ solid beam should not be squishy and crunchy when you squeeze it with your fingers. And it shouldn’t look like this…

    Rotted beam 1

    …or this…

    Rotted beam 2

    …when it’s taken off.

    Since these were load-bearing beams, supporting the patio roof above them once they were out was a challenge.

    Beams being replaced

    It takes a BIG saw to cut the new pieces to fit.

    Cutting the replacement beam

    Even that one wasn’t big enough to cut all the way through on the angle. But the new ones are in and as I write, the stucco guys are working on replacing all the insulation and stucco that had to come off as the beams came down. There’ll be drywall to fix too.

    Replacement beams in place

    The vigas turned out to be their own kind of challenge. The last time they were replaced, some didn’t get a good anchor inside the wall, so those had to be built. They’re actually screwed on to 12″ long lag bolts, which is a job for more than one person.

    Mounting the new vigas

    So it’s good-bye and good riddance to the old stuff…

    Waste vigas

    … and hello to the new. Get the stucco fixed up, the caulking and painting done, and that’ll be a few more things to check off the checklist.

    Now, about that flat roof….

    Save

    Save

    Save

    Save

  • Tile Be Seeing You

    The big push this past week, and coming up this week, is flooring. Tile-setter extraordinaire Kurtis continues to make progress on getting tile up on the walls and down on the floors, and the results continue to be spectacular.

    Master shower floor

    The tile in the master bath’s shower is smaller pieces of the tile that floors the rest of the room. Meanwhile, elsewhere in the master bath, the storage cabinet “towers” are now up on their granite pedestals.

    Master bath towers

    There’s still some trim and electrical work to be done, and the lights will have to be raised for better clearance above the yet to be installed mirror, but placing the towers marks another step completed. The faucets look good with the granite, even though we selected them months apart. “Blind squirrel finds nut,” as the saying goes.

    The same is true for the hardware in the guest bath.

    Guest bath shower

    The bamboo floors that are going to go down in the “German” bedroom, the master bedroom, and the office, have been another story. Bamboo, it seems, is very sensitive to temperature and humidity, both in the air and coming up from the slab. Kurtis also does floors and he has a tool that measures the (tiny) amount of moisture coming up out of the concrete. In the “German” bedroom and the office, it was fine; not so in the master suite. Why? No idea, but something–several somethings, actually–is going to have to be done to ensure the bamboo doesn’t misbehave once it’s down.

    One of those somethings is putting down a “quiet walk” pad. The bamboo boards are actually three layers of material, with the strands of the middle layer set at 90° to the other two, and then each board snaps together with the boards on either side. This “floating floor” (it’s not nailed or glued down) needs the pad underneath both for moisture control and to do just what the name suggests: make the floor quieter to walk on. This is what the pad looks like in the “German” bedroom.

    "Quiet Walk" pad

    In electrical news, a whole shipment of replacement switches, wall plates, and LED bulbs came in last week. The switches will replace the half-size ones that were originally ordered, like these…

    Switch plate

    and the wall plates are a more silvery color that won’t stand out against the walls the way these cream plates do.

    There’s progress outside the house, too. The support beams for the slats over the south patio have been put up.

    South patio slat support beam

    The slats themselves will follow in the next week or two.

    And the lawn, such as it is, is starting to come in.

    Back yard lawn

    It’s still the grass equivalent of peach-fuzz, but it’s a start. It’s a low-water-use, drought-tolerant grass called Buffalo grass.

    We’re about a month away from being done. (There: I’ve actually said it.)

    Save

    Save

    Save

  • Counter tops and walls–getting closer to completion

    I know I’ve been silent for the last couple of weeks. Stress had me out of it for the week before last, and then this past week, while the stress is under better control, it was just a very busy week. That’s not to say that nothing has been happening at the house; lots has! Let’s talk counter tops first, then the walls above them (and elsewhere).

    We’ll start with the master bath. Wherever there were windows, I had a hard time getting a shot that wasn’t half washed out by reflected glare. This was the one shot here that worked.

    Master bath counter top

    Unfortunately, the shots in the laundry didn’t come out so well. This is the best one.

    Laundry counter top

    I really wanted this green stone to go in the guest bath. Edith said when she was laying out the templates at the stone cutter, she couldn’t get a layout that would achieve that, so unfortunately, this is what we got.

    Guest bath counter top

    I don’t think that half-blue, half-green thing is going to work. We’re trying to make it better with the backsplash tile. More on that later.

    Finally, here’s the powder bath.

    Powder bath counter top

    The blue works well with the floor. We’ll see how well the cream and green work with the tile covering the wall.

    So, speaking of tile on the walls, tile-setter extraordinaire Kurtis is back, executing the designs Edith came up with.

    Master shower tile

    This is the shower in the master bath. That thing sticking out of the wall is the control for the water. The shower head will actually be on the wall to the right (out of the picture). This way I can reach in and turn on the water without having to duck out of the way of the spurt of cold water that will come out first.

    The shower/tub in the guest bath has a similar design but with a different pattern of small tiles.

    Guest bath shower tile

    Above the counter top, however, our attempt so far to use the small tiles to improve the transition between the green and the blue haven’t succeeded.

    Guest bath counter and back splash

    Kurtis tried putting more of the blue tiles into the mix but so far it isn’t working. Not sure what we’re going to do about that. This could end up being one major disappointment with the house.

    That was the status on the inside as of Friday. Outside, however, there’s still a little work to be done. The short walls on the front of the house are supposed to have a rounded stucco cap on their tops, but builder Bill has been concerned about water penetrating the stucco, grout, and CMU block, and then leaching out through the decorative stone (which isn’t real, solid stone). So for weeks the tops have remained unfinished, like this.

    Unsealed front wall

    But on Friday, one of the guys was putting on a sealant that we think will do the trick.

    Sealing the front wall top

    Once that stuff dries–and in the heat we’ve been having, it should be plenty dry by now!–the stucco guys will come back and build the caps.

    There’s been some other interior work done too. Mose the electrician was back putting in the surround-sound speakers in the ceiling.

    Putting in speakers

    (Here he’s adjusting the size of one of the holes.) So when he was down off the ladder to talk with Bill, I thought I’d take advantage of the new viewpoint to get a different look at the floor.

    High-angle view of floor

    This coming week, the big push will be to get more of the tile work done in the bathrooms and kitchens. Kurtis and I made some grout color selections but there are still others to be made. The toilets and more of the lighting will go in, the bamboo flooring in the master and “German” bedrooms will go down, and I think this is the week when the metal slats over the south patio will go up too.

    There are a few appliances still to go in, a lot of touch-up painting to be done, the floor in the office to be laid and the office cabinets and bookcases to be finished, and various and sundry other details to finalize. Bill is confident we’ll have everything all wrapped up next month, which is good because I need to get the mortgage that will replace the construction loan in place soon too!