  • Mirrors, Floors, and Tile

    As I expected, this past week has been a busy one as construction work wraps up. The mirrors went in, the last of the bamboo flooring went down, and almost the last of the tile backsplashes went in.

    Mirrors

    Mirror-maker Mo was back on Tuesday with the mirrors for the master and guest baths, plus a repaired antique mirror that will go in the master bedroom. He uses this way-cool laser device that guarantees a level mirror.

    Laser level

    Once he locates the horizontal and vertical centers on the wall, he uses the laser to show them along the full width of the space. By raising or lowering the height of the horizontal laser line, he can identify exactly where the mounting holes should go.

    Leveling using the laser

    And the end results are…

    Master bath mirror

    …in the master bath, and…

    Guest bath mirror

    …in the guest bath.

    Office floor

    Kurtis is back from vacation, and so we kept him busy, first with the floor for the office. Here he is laying down the glue for one of the final runs of the boards.

    Laying the office floor

    There’s too much glare coming from the windows to get a good idea of the color. This is a better image of the whole floor.

    Office floor

    Those white holes are openings for electrical outlets, which have now been installed. Their dark brown covers match the floor almost perfectly.

    This floor had to be glued down because the boards were not built to snap together the way the ones in the bedrooms were. The glue also serves as a vapor barrier from the concrete below, and there’s no need for that padding under the bamboo that we had to use in the bedrooms.

    Backsplashes

    Kurtis also installed the tile backsplashes in the kitchen. Here’s the backsplash above the cooktop under the overhead lights.

    Main kitchen backsplash

    And here’s the backsplash under a little side area with the under-cabinet lighting turned on.

    Side back-splash

    You can also see, right under the upper cabinets, the power and switch bar. By placing all of those controls up there, we didn’t have to worry about cutting tile to fit around the switches or outlets. If I want, I can add other things, like a clip to hold–and power–a phone or tablet, a USB port, or other things into the conduit with little effort. It’s almost “plug-and-play.”

    Monsoon storms

    Finally, July is one of our monsoon months, and that can mean some pretty stout storms. As I was leaving the house on Thursday, this storm was doing its thing out on the far side of the San Pedro Valley.

    Monsoon storm

    For reference, the Mule Mountains off in the distance just behind the storm are 13 miles away.

    There’s more wrap-up work to do but I’m expecting the final inspections to also be done this week and the county to issue the Certificate of Occupancy. I’ll close on the mortgage in early August and soon after that it’ll be time to move in.

     

     

    Save

    Save

    Save

  • New Home: A Quiet Week Before the Final Push

    Not much has happened this week. With the bamboo for the office floor needing the week to acclimate, tile and flooring setter Kurtis took the week off. Pretty much everything else depends on that floor getting done. The final push to finish everything will resume on Monday.

    “Monsoon” has arrived in this part of Arizona, though, which is a good thing. This literally is a monsoon–which just means a change of the prevailing wind direction–in our case from west or southwest to southeast. With the monsoon comes lots of moisture all the way from the Gulf of Mexico, which means thunderstorms and the bulk of our average 14″ of annual rain. The storms tend to be very spotty: raining like crazy at one spot, bone dry five miles away.

    Saturday was a good rain day, with 0.6″ delivered between two storms. And between those two storms, this rainbow, seen from the front door of my current house.

    Rainbow3

    The only other happening this week is part of the continuing saga of our local electric utility, the Sulphur Springs Valley Electric Cooperative (SSVEC) and their ongoing efforts to drive the rooftop solar industry out of their service area, while punishing those of us who have installed such systems already–with their (the co-op’s) past encouragement and financial help!–by quintupling one of the key rates they charge us. Back in May I testified at a hearing on SSVEC’s “rate case” (their request to raise rates) before an administrative law judge. Today (Sunday) and next Sunday I’ve had and will have a pair of op-ed pieces published in the local paper. Here’s the link to the first one. They’re playing a really nasty game of trying to make us (3% of their residential customer base) the villains while they try to raise all of their residential customers’ rates.

    Ultimately the Arizona Corporation Commission will decide whether SSVEC gets a rate increase, and if so, how much it will be, but I just couldn’t stand by while they, their CEO in particular, repeatedly slime us.

    We should know how all of this is going to play out before the end of the year.

    Save

    Save

    Save

  • Into the Home Stretch–Mirrors, Floors, and More

    We’re getting into the home stretch–no pun intended: the whole process of building this home has been a stretch! While there’s been some touch-up painting done this week, the biggest news has been regarding the floors.

    I’ve written before about how there was moisture coming up through the concrete in one of the guest bedrooms, the master bedroom, and the office. Not a lot, but enough in a couple of the rooms to be “out of tolerances” for the bamboo flooring we wanted to put in. The final decision was to lay down a sealer coat on the concrete and put in a whole-house humidifier, since bamboo is so sensitive to humidity, or the lack of it. Ironically, I’d asked about this when I’d first met the HVAC contractors, and at the time (not knowing what the flooring was going to be) they’d said it wasn’t needed.

    The unit isn’t very big. This is the tank that feeds the steam generator that feeds the air handler that pushes the air out throughout the rest of the house.

    Whole-house humidifier

    With that in place, the bamboo could go down in the master bedroom…

    Master bedroom floor

    and the guest bedroom…

    Guest bedroom floor

    …and the bamboo for the office could come out of its boxes and start “acclimating” there.

    Office flooring "acclimating"

    Sometime last week, or maybe even the week before, Kurtis had put a sealant on the slate flooring and accent pieces in the master bath. This is what the flooring looked like before the sealant (and the grout) were applied…

    Master bath tile

    …and this is what it looks like afterwards.

    Master bath slate post-sealer

    Hard to believe it’s the same floor! Edith and Kurtis told me the colors would “pop,” but wow!

    Besides the humidifier, one other plumbing-related system went in this week: a water treatment system. The neighborhood is served by a water company’s system, but the water is still very hard. The same company provides the water to my current house and I have calcium build-up everywhere.

    I really don’t like water “softening” systems, especially for the way the water feels and all the salt that would have to go into my septic tank, so I asked my plumber for other options. He proposed two: one called EasyWater, the other used to go by the Pelican brand name. Both treat the water so the calcium crystals won’t adhere to each other and to the surfaces of pipes and fixtures. EasyWater does it electronically, Pelican by running the water through a filter. Both, Dan said, work equally well (he has both at his house) but since the Pelican system was a few hundred dollars less, I went with it.

    Pelican system tanks

    (One of the fittings for the right-hand tank was leaking when I took the picture. It’s fine now.)

    I mentioned mirrors in the title, so I guess I’d better say something about them. On Thursday, I spent the afternoon in Tucson with Edith, looking at the remaining granite for possible use in the guest bath, checking out patio furniture (more on that in a minute), and talking with her mirror supplier, since I need mirrors in the master and guest baths. We looked at glass styles (beveled or not, and how much) and frames.

    Frames need to be picked where they’re going to be installed, so on Friday Mo brought a bunch down to compare while he also took field measurements. I made my selections and they should be ready in a couple of weeks. Mo also took with him an antique oval mirror I’ve had for ages to fix some of the decorative woodwork at the top. I’m planning on putting this mirror above the dresser in the master bedroom.

    Like the mirror frames, the cloth colors and patterns for the patio furniture should be selected on-site. Edith stopped by today so we could do that. We were standing in the kitchen, just about done, when she said, “There’s a bug or something on your shirt.” It was near the collar on the left side, where I couldn’t really see it, so, modern technology being what it is, she took a picture of it with her phone and showed it to me.

    Wasp!

    OK, now what, coach?

    It walked up the rest of the shirt and onto my neck. This could get interesting.

    Edith was close to freaking out. I decided to calmly and gently walk out onto the west patio and see if we (I) could encourage it to go elsewhere. A breeze blew it down onto my sleeve, and from there I was able to get it to walk onto a piece of paper, after which it flew away. My birthday present was not getting stung. I’ll take that!

    What’s on the agenda for this week? I’m not really sure. Kurtis is on vacation while the office flooring “acclimates,” so no other tile work will be done either. The bases for dining room table are being built down in Tucson, but they won’t come down until all of the other furniture does. Edith can get Paul working on the bases for the other tables for the patios, and the granite cut for their tops. Mo’s working on the mirrors. Maybe some more touch-up painting. I’m sure Bill’s got some things in mind.

    Save

    Save

    Save

    Save

    Save

  • Makin’ the Shade

    It’s been a long time coming but the shade over the south patio finally got installed on Thursday and Friday. This was the last major thing to be done on the exterior of the house. (Some of the cabling for the railing on that patio still needs to be run–more on that later–but by comparison, that’s a small thing.) So what does it look like?

    Let’s go back and take a look at the big hole that was. This was one side…

    South patio slat support beam

    And this was the other.

    South patio support beam east side

    (It’s harder taking a picture of a hole than you might think! )

    With that portion of the roof wide open, the patio below was very bright.

    Nearly finished south patio

    But now that the slats are in, things are A LOT different. This photo captures how different they appear, even though they’re all installed at the same angle relative to horizontal. It does a good job of showing how they’ll let some light in on an angle while blocking the more intense light from straight overhead, which is especially important now.

    South patio roof slats installed

    Seen from the great room, you can see how much more shaded the patio is now, yet light will still come in.

    South patio shade beams from inside

    I even got a little artistic, catching the reflection of the beams from the great room windows, while looking through the windows to a cloud visible through the windows on the other side of the house.

    South patio beams reflected in windows

    In short, this covering is going to make the patio much more usable during the summer or during the middle of the day at any time of the year. (They might even get us a LEED “innovation” point because they’re angled to bring in winter sunlight while blocking summer sun.)

    Earlier I mentioned the cable railing for the south patio. Here’s a close-up.

    South patio cable railing

    The cables provide the right combination of safety–the ground is as much as six feed down!–and visibility.

    In other news, most of the right wall switches and cover plates are now in (only the 4-way switches have yet to be installed). We’ve gone from this…

    Switch plate

    …ugh. Seriously? To this….

    Correct switches

    MUCH better!

    And speaking of covers, the cover for the kitchen vent hood exhaust pipe is now in place.

    Vent hood cover

    That looks much better too. I’m hoping this week the tile will go up on the wall below the hood and cabinets. Then the lighting for the counter tops can be mounted under the cabinets and the kitchen will be close to done.

     

    Save

    Save

    Save

    Save

  • Out With the Old (Vigas and Beams)

    One task that might not seem obvious at first when it comes to building a new home, green or otherwise, is deciding what to do with the old place. For me, that’s been an easy decision with this house: sell it! I HATED this house for the first couple years I was in it–a long, sad story I don’t need to repeat–and yet, to my amazement, I’ve now been here for almost 10 years, longer in one continuous stretch than any other location in my adult life! But before it can go on the market, certain things need to be fixed, especially the rotting exposed wood “vigas” and beams.

    The current house is a Santa Fe-style place, which means it has a flat roof, parapet walls, and these round wooden things sticking out of the walls that are supposed to look like the tree trunks “Native” peoples used to support the roofs and upper floors in pueblo-style homes. Those things are called vigas, and if they’re real wood (plastic ones are now available), between the heat and dryness we experience here most of the year, and the Monsoon rains we get mostly in July and August, they’re vulnerable to splitting and rotting over time. Actually, all exposed wood is vulnerable to this, even if it’s painted.

    I had the vigas replaced when the exterior was painted about eight years ago, but that’s enough time for them to fail again. Plus, two wooden beams, one facing south, one facing west, on one of my patios were succumbing to the same problems. How bad were they? Well, a 6″ X 10″ solid beam should not be squishy and crunchy when you squeeze it with your fingers. And it shouldn’t look like this…

    Rotted beam 1

    …or this…

    Rotted beam 2

    …when it’s taken off.

    Since these were load-bearing beams, supporting the patio roof above them once they were out was a challenge.

    Beams being replaced

    It takes a BIG saw to cut the new pieces to fit.

    Cutting the replacement beam

    Even that one wasn’t big enough to cut all the way through on the angle. But the new ones are in and as I write, the stucco guys are working on replacing all the insulation and stucco that had to come off as the beams came down. There’ll be drywall to fix too.

    Replacement beams in place

    The vigas turned out to be their own kind of challenge. The last time they were replaced, some didn’t get a good anchor inside the wall, so those had to be built. They’re actually screwed on to 12″ long lag bolts, which is a job for more than one person.

    Mounting the new vigas

    So it’s good-bye and good riddance to the old stuff…

    Waste vigas

    … and hello to the new. Get the stucco fixed up, the caulking and painting done, and that’ll be a few more things to check off the checklist.

    Now, about that flat roof….

    Save

    Save

    Save

    Save

  • Tile Be Seeing You

    The big push this past week, and coming up this week, is flooring. Tile-setter extraordinaire Kurtis continues to make progress on getting tile up on the walls and down on the floors, and the results continue to be spectacular.

    Master shower floor

    The tile in the master bath’s shower is smaller pieces of the tile that floors the rest of the room. Meanwhile, elsewhere in the master bath, the storage cabinet “towers” are now up on their granite pedestals.

    Master bath towers

    There’s still some trim and electrical work to be done, and the lights will have to be raised for better clearance above the yet to be installed mirror, but placing the towers marks another step completed. The faucets look good with the granite, even though we selected them months apart. “Blind squirrel finds nut,” as the saying goes.

    The same is true for the hardware in the guest bath.

    Guest bath shower

    The bamboo floors that are going to go down in the “German” bedroom, the master bedroom, and the office, have been another story. Bamboo, it seems, is very sensitive to temperature and humidity, both in the air and coming up from the slab. Kurtis also does floors and he has a tool that measures the (tiny) amount of moisture coming up out of the concrete. In the “German” bedroom and the office, it was fine; not so in the master suite. Why? No idea, but something–several somethings, actually–is going to have to be done to ensure the bamboo doesn’t misbehave once it’s down.

    One of those somethings is putting down a “quiet walk” pad. The bamboo boards are actually three layers of material, with the strands of the middle layer set at 90° to the other two, and then each board snaps together with the boards on either side. This “floating floor” (it’s not nailed or glued down) needs the pad underneath both for moisture control and to do just what the name suggests: make the floor quieter to walk on. This is what the pad looks like in the “German” bedroom.

    "Quiet Walk" pad

    In electrical news, a whole shipment of replacement switches, wall plates, and LED bulbs came in last week. The switches will replace the half-size ones that were originally ordered, like these…

    Switch plate

    and the wall plates are a more silvery color that won’t stand out against the walls the way these cream plates do.

    There’s progress outside the house, too. The support beams for the slats over the south patio have been put up.

    South patio slat support beam

    The slats themselves will follow in the next week or two.

    And the lawn, such as it is, is starting to come in.

    Back yard lawn

    It’s still the grass equivalent of peach-fuzz, but it’s a start. It’s a low-water-use, drought-tolerant grass called Buffalo grass.

    We’re about a month away from being done. (There: I’ve actually said it.)

    Save

    Save

    Save

  • Counter tops and walls–getting closer to completion

    I know I’ve been silent for the last couple of weeks. Stress had me out of it for the week before last, and then this past week, while the stress is under better control, it was just a very busy week. That’s not to say that nothing has been happening at the house; lots has! Let’s talk counter tops first, then the walls above them (and elsewhere).

    We’ll start with the master bath. Wherever there were windows, I had a hard time getting a shot that wasn’t half washed out by reflected glare. This was the one shot here that worked.

    Master bath counter top

    Unfortunately, the shots in the laundry didn’t come out so well. This is the best one.

    Laundry counter top

    I really wanted this green stone to go in the guest bath. Edith said when she was laying out the templates at the stone cutter, she couldn’t get a layout that would achieve that, so unfortunately, this is what we got.

    Guest bath counter top

    I don’t think that half-blue, half-green thing is going to work. We’re trying to make it better with the backsplash tile. More on that later.

    Finally, here’s the powder bath.

    Powder bath counter top

    The blue works well with the floor. We’ll see how well the cream and green work with the tile covering the wall.

    So, speaking of tile on the walls, tile-setter extraordinaire Kurtis is back, executing the designs Edith came up with.

    Master shower tile

    This is the shower in the master bath. That thing sticking out of the wall is the control for the water. The shower head will actually be on the wall to the right (out of the picture). This way I can reach in and turn on the water without having to duck out of the way of the spurt of cold water that will come out first.

    The shower/tub in the guest bath has a similar design but with a different pattern of small tiles.

    Guest bath shower tile

    Above the counter top, however, our attempt so far to use the small tiles to improve the transition between the green and the blue haven’t succeeded.

    Guest bath counter and back splash

    Kurtis tried putting more of the blue tiles into the mix but so far it isn’t working. Not sure what we’re going to do about that. This could end up being one major disappointment with the house.

    That was the status on the inside as of Friday. Outside, however, there’s still a little work to be done. The short walls on the front of the house are supposed to have a rounded stucco cap on their tops, but builder Bill has been concerned about water penetrating the stucco, grout, and CMU block, and then leaching out through the decorative stone (which isn’t real, solid stone). So for weeks the tops have remained unfinished, like this.

    Unsealed front wall

    But on Friday, one of the guys was putting on a sealant that we think will do the trick.

    Sealing the front wall top

    Once that stuff dries–and in the heat we’ve been having, it should be plenty dry by now!–the stucco guys will come back and build the caps.

    There’s been some other interior work done too. Mose the electrician was back putting in the surround-sound speakers in the ceiling.

    Putting in speakers

    (Here he’s adjusting the size of one of the holes.) So when he was down off the ladder to talk with Bill, I thought I’d take advantage of the new viewpoint to get a different look at the floor.

    High-angle view of floor

    This coming week, the big push will be to get more of the tile work done in the bathrooms and kitchens. Kurtis and I made some grout color selections but there are still others to be made. The toilets and more of the lighting will go in, the bamboo flooring in the master and “German” bedrooms will go down, and I think this is the week when the metal slats over the south patio will go up too.

    There are a few appliances still to go in, a lot of touch-up painting to be done, the floor in the office to be laid and the office cabinets and bookcases to be finished, and various and sundry other details to finalize. Bill is confident we’ll have everything all wrapped up next month, which is good because I need to get the mortgage that will replace the construction loan in place soon too!

    Save

    Save

    Save

    Save

    Save

    Save

  • Starry, Starry Night…

    “…Paint your palette blue and gray / Look out on a summer’s day…”

    When it comes to the floor in my house, I can’t help thinking of Don McLean’s song “Vincent,” which starts out with the title of the post and those next two lines. It’s an homage to Vincent van Gogh, and there certainly has been artwork committed on my house. No face on the barroom floor, this.

    You may remember that I had this idea to embed the white quartz that’s all over my property in dark-blue-stained concrete and then have both polished. And I wrote about how that dream turned out not to be possible in reality. Well, what happened in its place is done and it’s nothing short of beautiful. For example, the great room went from this…

    Great room floor layer 2

    …to this…

    Great room floor, layer 1

    …to this.

    Finished great room floor

    And the kitchen went from this…

    Kitchen layer 2

    …to this…

    Kitchen layer 1

    …to this.

    Finished kitchen floor

    And something you haven’t seen before, one of the hallways.

    Finished exercise room hallway floor

    Right. So where are the stars? Well, you can see hints of them at the bottom of the image above but here’s a better look.

    Finished starry floor

    The “stars,” as it turns out, are hard to see unless you look pretty much right at your feet. Two reasons for that. First, they’re quite small. Cannon and I tried to strike a balance between dots that were big enough to be visible and dots that didn’t speckle-out the whole floor or make it look polka-dotted. Second, with the final floor polished and waxed, the glare from all the windows washes them out. So maybe it’s not quite as dramatic as I first envisioned, but it’s still what I wanted: the feeling of walking on the night sky. Because Cannon and his family spent many long hours on this, he was at the house after dark, and told me yesterday that during the day, the black paints show up more but at night, under the ceiling lights, the blues come out more. I haven’t been there at night since the floor went down, so I’ll take his word for it.

    He’s got one more task to finish, and that’s the final touches on the protective coat on the garage floor. (No pictures of that: there’s really nothing to see. The floor is now a beige rather than gray.) That’ll be done tomorrow.

    But all have been, as McLean also sang, “soothed beneath the artist’s loving hand.”

    Save

    Save

    Save

  • Memorial Day 2016

    Headstones, Southern Arizona Veterans Memorial Cemetery

    Today, the last Monday in May, is Memorial Day, the day America honors (or is supposed to honor) those who have died in military service to their country.

    Every year I attend the Memorial Day ceremony at the Southern Arizona Veterans Memorial Cemetery near my home. I don’t do anything other than attend, but besides being physically present, I attend to the memory of the friends I have lost during my, and their, service:

    • Chris Claudio. Two years ahead of me at the University of Colorado, we were both in the Air Force ROTC cadet corps there. Chris became a pilot and died in a training accident while flying an OV-10 aircraft in Germany.
    • Joe Schewe. Joe was one of my classmates at Undergraduate Pilot Training at Vance Air Force Base in Oklahoma. Joe graduated (while I did not) and returned to Vance as a T-38 instructor pilot, where he was killed in a training accident.
    • The crew of Yukla 27, an E-3 AWACS aircraft. The 24 members of this crew were killed when their jet crashed shortly after takeoff on a training mission from Elmendorf AFB, Alaska, after it hit a flock of geese in late September 1994. Larry DeFrancesco had been a member of my squadron in Oklahoma before being reassigned to Alaska. One of the navigators on the jet had flown for me when I was the AWACS Detachment Commander in Panama in June of that year.
    • Pete DeMaster. I’ve written about Pete before. He was one of my first instructors when I got to Tinker AFB in Oklahoma. He died in the bombing of the Alfred P. Murrah Federal Building in Oklahoma City in 1995.

    None of these men died in combat, yet all died in service to America. Most, you might have noticed, died in training. Combat is, of course, a deadly dangerous business. So can training be. I was involved in my own share of in-flight emergency situations, or situations that could have turned deadly. On one mission, my crew and I proved that the jet we’d been ordered to fly was dangerous, even when our maintenance personnel told us it was safe, just because of a difference between two minimum-required-equipment lists. We survived, but seven other jets were grounded until they could be fixed because of what we discovered and proved.

    There are few civilian jobs that can compare to the risks military personnel take every day. Most days, everything works out just fine. Some days, however, they do not.

    Memorial Day is not just about those who died in service, however. It’s also about those who served before us and have passed on. Including these two.

    My parents' columbarium niche marker

     

    Save

    Save

  • I’m just floored–and that’s a very good thing!

    Week 1 of Cannon Wood’s work on the floors is done and all I have to say is, WOW! How wow? Let me show you, starting with the walk leading to the front door. Before, it was just plain concrete:

    Plain walkway

    Notice the plain concrete of the entry porch too. But now it looks like this.

    Painted walkway

    And this (and all of the other exterior pictures), are before the final sealer is put on, which will bring out the colors even more.

    When Cannon’s wife Susan and son Jacob were working on the entry porch a few days ago, it looked like this.

    Entry porch in progress

    The colors are being put on with sponges, not unlike the faux finishes that were so popular on interior walls a few years ago. In this case, the result is a faux slate. The darker color borders panels of lighter “stones.”

    Nearly complete entry porch

    So how did they get those grout lines between the individual “stones?” Before the color and texture coats were put down, Cannon and family put down a white coat and carefully laid in tape. The tape lines are the faint gray and yellow lines you can see here on the south patio.

    Tape lines on the south patio

    Then they put down the texture coat of cement, then the colors, and finally carefully removed the tape, so the “stones” actually present a raised surface about the “grout,” as if they were real stones.

    Nearly finished south patio

    As you can see, we used the expansion joints in the concrete to define the borders between the panels. They’re such big and blatant lines that this was the best way to integrate them into the overall design. There are a few small places on the west patio where we couldn’t do this but for the vast majority of all three exteriors, we could.

    Speaking of the west patio, it started just like the others: plain gray concrete. Here, Susan and Jacob are again coloring the borders.

    West patio in progress

    And the pre-sealer result looks like this:

    Nearly finished west patio

    There are a few “stones” that look a bit too pink to me, so Cannon’s going to touch them up before the sealer goes on. I don’t have a good shot of it but these colors really integrate well with the landscaping stone and the grasses beyond as well when seen from inside.

    Now let’s go inside.

    Just like the patios, the interior floors have mostly been just plain gray concrete, except where the tile has been put down. Here’s the great room (you can’t see much of the floor)…

    Great room entertainment center

    …and here’s the kitchen before the counter tops went in.Kitchen before floor painting

     

    The interior floor is going to be built up in layers, so what I’m about to show you are the first two. Here’s the dining room and great room, layer 1:

    Great room floor, layer 1

    And layer 2:

    Great room floor layer 2

    Kitchen layer 1:

    Kitchen layer 1

    And layer 2:

    Kitchen layer 2

    Now, this light blue color is a kind of base coat. The final floor will be MUCH darker. Cannon brought a sample board but it didn’t photograph well, so you’ll just have to wait to see where we’re headed. Even so, with this sky blue color the cabinets are already starting to “pop.” This coming week, more magic will happen.

    Finally, let’s go back outside one more time. One of my cow’s-tongue prickly pear cacti bloomed on Friday.

    Blooming cow's-tongue prickly pear

    And it’s putting out new pads too. It’ll be even happier when summer Monsoon rains start in July.