    On May 25th, my interior designer, Edith Villalobos-Zamora, was featured in a piece on one of Tucson’s TV stations. You can watch the video on KOLD-TV’s web site or click on it below. Unfortunately, the TV station’s web site seems to be awfully slow, so I’ve posted it under the link below, which will take you to a separate screen to view it.

    Chamber to unveil solution to border banking problem

    Congratulations, Edith!

  • Lights, Switches, Roof

    Not exactly “lights, camera, action,” lacking only the camera, and I’ve provided that.

    The last week-plus have felt like three steps forward, two sideways, one backward. Let’s start with one of the steps forward: the roof over the south patio. In one of my previous posts, I wrote about how we were working on figuring out just how the slats of the main part of this patio would be built, arranged and tilted. Well, Rick from Weatherguard came back late in the week before last with a new plan. When we put the template up against one of the sides that it will be mounted to, it was clear we’d found the right answer. Unfortunately, it’s not visible in the photos I took! D’oh! But it works! Really it does.

    Then, this past week was supposed to be the big interior electrical week in which all of the light fixtures and switches were supposed to be installed and all of the outlets energized. “Supposed to be.” Yeah, you can see where this is going.

    There IS good news. Many of the fixtures did get installed, like the one in the dining room…

    Dining room lamp

    …hanging a LONG way down from the ceiling. And the cable lighting system that goes in one of the halls leading to the master bedroom…

    Cable lighting in hallway

    This is just one of the fixtures. There’s another one like it at the other end, plus three spotlights in between. We’ve left the hanging cable looped until we know how high or low the lamp should hang.

    And there are ceiling fans. This one is in the “oriental” bedroom.

    "Oriental" bedroom ceiling fan

    And this one is in the office.

    Office ceiling fan

    Yes, those blades are curved as much as they seem to be! There are other lights and ceiling fans too, of course. And there are lots and lots of can lights in the ceilings in many of the rooms. All of the lights have either LED or compact fluorescent bulbs in them. I’d wanted to go all-LED but some of the fixtures didn’t have that option.

    The carriage lights on the outside of the garage have been installed too. This is a close-up of one:

    Carriage light close-up

    And here are all three.

    Carriage lights

    These particular lights came in three sizes and we picked the middle one. That choice worked well. There’s a glass plate in that rectangle below the main body but it’s not really either a reflector or a diffuser, so it remains to be seen–literally–how much light they’ll actually provide to the driveway. But they look nice.

    And then there were the switches and switch plates. Notice anything wrong with this one?

    Switch plate

    Three big holes, right? Yeah, and this is where we get into the steps sideways and backwards. Just about all of the switches themselves are half the width they’re supposed to be. The company makes full-width and half-width switches so two switches could be fit into a space that ordinarily would have had only room for one (or four in space for two, or six in space for three, etc.). Unfortunately, when our contact at the lighting store placed the order, she didn’t see the full-width switches in the catalog and only ordered the half-width ones. So now all of the wrong ones will have to be replaced. Guess who’s NOT paying for that mistake!

    But wait, there’s more! SIGH. Not all of the light fixtures we ordered came in. And some, like that dramatic one in the dining room, are missing something. So now, not only do we have to wait for the rest of the order to come in and for the corrections to be made, the electricians won’t be able to get back into the house for another two weeks.

    “Why?” you ask.

    Because for the next two weeks, no one will be allowed in while Cannon does his painting magic on the floors, not only inside the house but also on both patios, the entry porch, and the entry walk. This should be really interesting. Stay tuned!

     

    Save

  • Decision Week

    Not that every week isn’t a “decision week,” but it seems this week has more to make than most. Bill sees the light at the end of the tunnel and, especially with another HOA deadline looming, wants to keep pushing to get this thing done. He’s not alone.

    First up was the granite. Gage, our contact at Bedrosian’s Tile in Tucson, started pumping ideas for alternatives to the Blue Storm granite on Monday. My cousin Stephanie, who’s an interior designer in Dallas, also sent a few. And I poked around on the Bedrosian’s web site myself. A few were interesting but when we got to looking at what was actually in stock, as opposed to what the example picture showed, the “interesting” list headed toward “none of the above.” Then Bill told me that the folks who were actually going to be cutting the stone had not only picked up the two slabs for the master bath, they’d reserved one more.

    The 25W (non-LED) light bulb above my head began to flicker: if there was enough of stone we were going to use in the laundry and guest bath for the powder bath too, the Golden Ridge stone in the master bath would look good in the office.

    Sure enough, there was, and so it was time to stop the hunt for Red October—I mean, more Blue Storm. Definitely a case of Red—I mean, Blue—Storm sinking, not rising. (OK, enough with the Tom Clancy puns.)

    Edith visited on Tuesday and as we were standing in the kitchen, she realized that there’s no longer a soffit above the kitchen cabinets on the wall above the range and range hood. Uh-oh! Her tile design for that wall had been predicated on the soffit being there, but we’d gotten rid of it long ago. Now there’s this big, tall, uninterrupted wall rising behind the cabinets, not from their front. Oops! (It goes up several feet beyond the top of this picture.)

    Kitchen counters, wide view

    So after lots of back-and-forth, the design goes from this…

    Original range hood wall design

    To this.

    New range hood wall design

    While I lose some of the artsy tile work above the range hood (that triangular thing in the center), I can always put something in between the vent pipe cover and the cabinets if I want. There’s more space than there appears to be in the drawings.

    That decision went final today.

    Also this morning, Cannon Wood, who’s going to be doing the floor, brought over some design ideas for it, and I picked my preference. We also talked about the designs for the patios—he’s going to do his magic on them too: Slate look or flagstone look? With border or without border?—as well as options for the walk and front porch and the garage floor. Since he’s starting the week after next, I need to make those decisions soon!

    The fun just keeps on coming! Next week: light fixtures, paint touch-up, switches, sockets, and cover plates go in, and more work gets done in the office.

    Save

  • The Continuing Saga of Counter-top Place

    There’s been good news and bad (or, bad-ish) news on the counter-top front this week. The good news is that the counter tops in the kitchen and pantry were installed on Monday. Take a look! Here’s the kitchen.

    Kitchen counters, wide view

    And here’s the pantry.

    Pantry counter top

    The material we’ve used here goes by the brand name Curava® and this particular version is called Arctic Blue. It’s made of crushed white quartz and a binder, plus pieces of recycled clear, gray, and blue glass (which should get us a LEED point for using recycled materials). You can see the glass bits a little better in this close-up.

    Island counter close-up

    (And yes, the bowls of the sink are two different sizes. Different depths, too.)

    The not-so-good news is that apparently that piece of Blue Storm granite was broken so badly in transit to Tucson that it was unusable. And with no other slabs seeming to be available, what are we going to do? Edith was at a big interior design trade show in Las Vegas last week and put out all sorts of feelers to see if anyone else could find a piece. While she was doing that, I put out similar feelers to a cousin in Dallas and the wife of a friend in Las Vegas, both of whom are interior designers. And in case none of them find anything, I’m looking at other kinds of granite. With SO many choices out there, there’s got to be something that will look good–maybe even better than what we had chosen!

    Otherwise, things keep plugging along. On Thursday, Bill and I met after dark at the house to test some LED light strips we’d borrowed from Sun Lighting, our supplier in Tucson. We were trying to figure out how to light the south patio under the slatted roof. Once we found a hot electrical outlet (not all of them have power yet!), we settled on a choice pretty quickly, and the good news is the strips are so bright that just three should provide comfortable lighting for social activities. Now we just have to figure out how to attach them to the bottoms of the slats that Weatherguard, our roofing contractor, is designing. Magnets should work since the slats will be steel.

    Speaking of those slats, my intent with them is to have them angled so they let in maximum light in the winter and little or no direct light in the summer. But what should that angle be? And how wide should the slats be, and how far apart? Who knew this would be so complicated? Well, thanks to Google Earth and the web site of one of the universities in California, we got the angles figured out, and from there the supervisor at Weatherguard has worked on the rest. On Monday we’ll see his latest design. (At noon on December 21st, the winter equinox, the sun will be 35.1° above the horizon; at noon on June 21st, the summer equinox, 82.1°. I know you were just dying to know that!)

    Finally, this week I purchased the doorbell for the house. That doesn’t seem like a big deal but today doorbells can be programmable! You don’t have to be stuck with ding-dong or bzzzzzzzz. And I didn’t want to be. ‘Way back in 1968, Bill Cosby recorded an album called “200 M.P.H.” in which he talked briefly in the title track about how he was tired of doorbells that just go “ding dong.” So he had one made that announced, “Somebody’s at the door!” Now he’ll do that for me, too. I found that portion of the track (it’s just over a second long!), extracted it to an MP3 audio file, and loaded it into the doorbell. (I’d demonstrate it here but that’s a potential copyright violation. Instead, you’ll have to come visit.) How well will it work? I’ll know once we get it installed. And we’ll see how soon I get tired of it.

     

    Save

  • This Is Why

    Pete's Chair

     

    Pete DeMaster.

     

    LaKesha Levy.

     

    Cartney McRaven.

     

    165 others.

    The 167 killed people killed in the bombing of the Alfred P. Murrah Federal Building in Oklahoma City on April 19, 1995, and the one person who died three days later when a piece of debris from the building fell on her while she worked to recover the bodies of the others.

    Each is now memorialized by one of these chairs (this is my friend Pete’s) in the Field of Empty Chairs in the footprint of the Murrah Building on the grounds of the Oklahoma City National Memorial.

     

     

     

    The Field of Empty Chairs

    Over the weekend I was in Oklahoma City volunteering with the Memorial Marathon that’s put on each year to honor those killed and injured in the bombing, and those whose lives were changed forever. Including mine.

    Each of the people who died had a story, of course, about why they were at the Murrah building that day.

    Pete had been one of my first instructors when I came to the 552nd Airborne Warning and Control Wing at Tinker Air Force Base, and we quickly became friends. He later left the Air Force to become an investigator for the agency that did background checks on people applying for or updating their security clearances. Pete only worked one day a week at his office in the Murrah Building.

    April 19th was that day.

    I didn’t know Cartney or LaKesha but both were junior Airmen assigned to Tinker. Both were at the Social Security office, LaKesha to get a Social Security card, Cartney to do name-change paperwork.

    She had gotten married on April 15th.

    When the bomb went off at 9:02 that morning, I was 7½ miles away, inside a concrete building, planning for an AWACS training mission my crew and I were going to fly the next day. We heard the explosion and thought someone upstairs had knocked over a table or filing cabinet.

    Until we learned differently.

    But the Marathon and this post aren’t about death, even the deaths of my friend and my fellow Airmen. It isn’t about bomber Tim McVeigh’s cruelty and cowardice, or the blind, dumb luck that put an Oklahoma Highway Patrol trooper at the right place at the right time to notice that McVeigh’s getaway car had no license plate. It isn’t about the slow grind of the judicial system that kept McVeigh in custody long enough for him to be connected with the bombing.

    This post isn’t even about my guilt about not having gone down to the bombing site to help with the rescue and recovery efforts, although that is one reason why I’ve volunteered with the Marathon for each of its 16 years.

    This post isn’t about the political leadership that guided the city, the region, and the people through the recovery process, either, so unlike the one after 9/11, when the political environment was already fraught with conflict, and from which it has yet to recover.

    No, for me the Marathon and everything surrounding it are about people. People who band together and persevere in the face of stunning and heart-wrenching, inexplicable tragedy, who form friendships and partnerships, who focus not just on going on, on surviving, but on turning tragedy into something positive, something inspiring, something that looks to the future while remembering and honoring the past.

    The Survivor Tree

    Like the Survivor Tree, the American Elm that survived the bombing and has become the Memorial’s symbol, Oklahoma City and the surrounding region have recovered, taken other body-blows (in the form of massive, deadly tornados), survived, recovered again, and not just gone on, but gotten better. The people here learned to weather all kinds of storms they could not have imagined before they happened. They have learned about strength–strength they never knew they had–and resilience. And dignity. And grace.

    About hearts emptied and refilled. By a marathon. And a Field of Empty Chairs.

    Save

  • Book 3, Starting Draft 2

    One of the things writer Anne Lamott is famous for is her advice, “Give yourself permission to write a shitty first draft.” To me that’s a kind of liberation theology for writers, but that’s a subject for another time. Today I’m going to continue to pull back the curtain on my writing process, at least as it relates to getting all the scenes in order for the second draft of this book.

    So: “Give yourself permission….” Done.

    “Write a shitty first draft.” Done.

    OK, maybe “shitty” is a relative term, but while my read-through of the first draft got a “not bad” rating, as I wrote last time there were problems with the timeline, that is, the sequence of events in the plot. Timeline is especially critical for this book for two reasons.

    • One, it needs to end at a certain time of year in order to take advantage of certain weather phenomena in Dallas.
      • One-a, there are other events in the book that take place outdoors. They needed to fall at times of the year when they could take place outdoors or something would have to change.
    • Two, this book, like its predecessors The Eternity Plague and Chrysalis, has five–count ’em, five–interconnected story lines happening at once, so the sequencing of the events in each story line needs to be right.

    Since I knew I had problems, and on top of that I had about 50 scenes that weren’t organized into chapters, I had two tasks that needed to happen pretty much in parallel: figure out the overall timeline and get those scenes into chapters. Then I could look for the scenes I already knew were out of order and identify where they should have gone.

    Because I’m a “plotter”–that is, I work from an outline–building an updated outline of the story would take care of those tasks. I do this using Microsoft Excel. Yes, the spreadsheet program. I have a column for the chapter and scene number, a column for each major and key minor character, and a column for the timeline. With Excel, I can have as many columns as I want and not have to worry about trying to fit them all into one page, even in landscape format, which is what I’d have to do if I tried to use a Word table.

    Since there are five major characters–Janet Hogan, the protagonist; Lisa Lange; Sarah Green-Dale; Reverend Will Baxter; and Lew Crandall–that’s where the spreadsheet started. Then I added the key minor characters associated with them, plus one for “Others.” To make them easier to see, I color coded the cells on the spreadsheet row with the characters’ names: pink for Janet and her crew, red for Lisa and her crew, etc.

    Instead of one chapter/scene column, I put two in this time: one for where each scene fell in draft 1 and the other for where they needed to go in draft 2. Next, I added one column for how each scene related in time to the one before it, and one more for what calendar month and year that scene fell in.

    Then, on the row for each scene, I wrote a brief description of what happened in the scene in the column or columns for the characters involved.

    The end result: 18 columns by 142 rows! In other words, this, taped up on my guest bedroom wall:

    The Draft 2 outline

    Yikes. That’s three landscape-format pages wide by 10 pages tall! It’s so big, I had to split it into two 3-pages-wide by 5-pages-tall sets. This technique is NOT for everyone!

    Before I printed this monster out, I did that sorting of which scene needed to go where. Here’s an example from the beginning of the novel.

    Chapter 1 scene sequence

    Outlined in blue, you can see how I planned to bring three scenes from chapter 2 forward into chapter 1.

    I also worked out the timing. Here’s the timeline for those same scenes.

    Chapter 1 timeline

    But aren’t those August 26th scenes out of order? Well, by strict definition, yes, but hey, I’m a writer–I can finesse that! “Two weeks earlier…”

    Great! Now I had a plan and could start editing.

    But of course, no plan survives first contact with reality, and that’s what happened today. I was chugging along, working on what was supposed to be scenes 7 and 8 of chapter 1 when I discovered that they needed to go before the three scenes I’d pulled in from chapter 2, not after! D’oh! OK, that’s an easy fix.

    These are some of the reasons why the first draft of a novel should NEVER be the final draft.

    And you thought writing a novel was easy.

    Save

  • Taking Nothing for Granite

    OK, sorry, I couldn’t resist. It was either that or borrowing the lines or titles from one of these songs:

    • Neil Diamond’s “Stones”
    • Queen’s “We Will Rock You”
    • Bob Dylan’s “Everybody must get stoned…”
    • Of course, The Rolling Stones’ “Only Rock ‘n Roll”

    I’m sure there were others I could have named too.

    What’s this all about? You may remember sometime back I wrote that when Edith and I had selected granite slabs for counter tops in the house, we had NO idea it would take so long before the house was ready for them. As a result, we didn’t reserve them, and because of that, the suppliers sold the pieces we’d picked. D’oh!

    So now that we’re finally ready for the slabs, we had to go back to the suppliers and see what they had. OK, no problem, right?

    No. Problem.

    One of the suppliers no longer had any of the Blue Storm we’d selected in stock. Not in Tucson, not at any of their other stores. Well, they did have one piece… but it was really orange. SIGH. All right, we’ll see what else they have.

    Meanwhile, they didn’t have any of the Timbalada stone in stock, either, but there was another slab at one of their other stores. “Get it!” I said.

    They did, and on Tuesday I drove down to Tucson. And the result was…. (Drum roll, please.)

    "Timbalada" granite

    That lower right corner looks kind of icky brown, doesn’t it? In person it’s A LOT more green. Perfect for the guest bath.

    But no Blue Storm. Or…?

    The salesman said that just for grins and giggles he’d checked their online catalog and what, to his wondering eyes, did appear, but this.

    "Blue Storm" granite

    “Get it!” I said.

    OK, those problems are solved. But there was one more to pick, at another store. We’d originally picked a stone called “Golden Crystal” for the master bath, with a back-up stone called “Golden Ridge.” The folks at Arizona Tile kindly pulled one of each from their stock, and a good thing they did. The Golden Crystal had more gray than gold, but the Golden Ridge?

    "Golden Ridge" granite

    Much better. And what gray there is will complement the gray in the slate floor tiles. We have a winnah!

    There’s one thing these pictures can’t show–and it’s my fault for taking them the way I did–and that’s how big these slabs are. Each one is about 5 feet tall by 7 or 8 feet wide. That’s A LOT of stone, and while we won’t use all of it, we need to have that much to be sure that we have enough. Some of the Blue Storm will get used for the big desk that will go in my office. What will happen to the rest? Well, we’ll just have to see.

    Stone work has been the major effort this week at the house too. More of the front landscaping has gone in.

    Cow tongue prickly pear

    That funny-looking guy and the one behind it, closer to the street, are cow-tongue prickly pear cacti.

    The Texas Mountain Laurel that will (eventually) hide the utility boxes on the front of the house is in as well.

    Texas Mountain Laurel

    It (that’s really just one plant) will grow taller and fill out. Eventually it’ll look more like this.

    Texas mountain laurel 2

    Out back, another “river feature” has gone in to channel overflow from the rainwater harvesting tanks through the future lawn and toward the wash.

    River feature

    That slab of flagstone will make it easier to cross. (But who might be living under the bridge?)

    And speaking of living, I have tenants.

    Bird nest

    I’m not sure who the “construction engineers”–or the real estate agents, especially–are but some feathery friends decided that the cover over this electrical outlet above the south patio looked like a good place for a nest. Uh, maybe not. We will be needing to get to that outlet soon.

     

    Save

  • Paving the way to more progress

    Yeah, OK, I couldn’t resist the pun, but there’s been some important work on surfaces inside and out this week. Let’s get right to it.

    Last weekend Bill asked me if I could come down to the house so we could lay out the final plan for the asphalt part of the driveway, and of course I said yes. You may remember that we’d done this once before, but with all the construction traffic, the lines we’d painted on the dirt were long gone. This time, though, the paving company was going to be out the next day.

    This is a very exacting process: “Let’s start here, go straight to about there, curve it around to there, then there, and then straight again to there.”

    “Here?”

    “No, over to your right a little… yeah, there.”

    Put down some rocks to mark the spots, and then paint them.

    Painting the rocks

    Anybody who’s been in the military will find that activity all too familiar, but you have to paint rocks because the soil is so dusty it just blows away when the spray paint hits it.

    But short lines turn into long lines…

    Outlining the driveway

    … and long lines turn into an outline…

    Outlining the driveway 2

    (sorry, Bill, I didn’t mean to keep shooting you that way!) and then outlines turn into paving…

    Driveway 1

    …including some guest parking space. It’s magic!

    Driveway 2

    Meanwhile, around back, there’s now a path from the edge of the future grassy area down to the wash.

    Path to wash

    And we made good use of more of the dead trees on the property.

    There’s been progress inside too. Tile-setter extraordinaire Kurtis has gotten most of the master bath and closet floor tile down and it looks pretty awesome, if I do say so myself.

    Master bath tile

    Some of this slate has fossil plants in it. Not these tiles, but one piece in particular, which was cracked and unusable anyway, got put aside because the fossil’s so visible. (Unfortunately, I haven’t taken a picture of it.) We’ll use it for something–I just don’t know what yet.

    The carpenters have been hard at work in the office too. A couple posts back I wrote about how they just barely got some pieces in. Well, now it’s time to put in the big piece behind where the desk will be. Kids, don’t try this at home!

    That’s hard work! (And thanks to YouTube for stabilizing the video. The original was a lot shakier.)

    But then… uh-oh. The top is just a little too big! It blocks part of the vent for the air-conditioning duct.

    AC duct blocked

    It’s hard to see, just a matter of a few inches, but it’s got to be dealt with. The good news is that the cabinet won’t have to be rebuilt. The bad news is that it had to be taken out so the drywall guys can come in and put in a piece to seal up the space. The vent cover will probably have to be remade to fit the new, smaller hole. Ah, well. This is a normal part of the process: adjust here, tweak there, and eventually it all comes together. And if I hadn’t been there to see it, I probably would never have known.

    Save

  • Book 3, Draft 1

    Woman reading a book
    Image courtesy of Marin / FreeDigitalPhotos.net

    Last night I finished my first complete read-through of the first draft of book #3 (working title, Guardians, although I’m considering Wild Spread as an alternative). (No, that’s not me over there on the right. My ideal reader, maybe. At least her interest level looks right.) I’ve got almost 10 pages of hand-written notes of things to check, fix, delete, etc.

    Overall verdict: not bad.

    There are some scenes that are way out of position. There’s a place where one of my secondary characters chrysalizes, then a few chapters later appears again in her unchanged, original form, as if the chrysalization never happened. Oops. Well, that’s the sort of thing that happens in a first draft. The fix should be easy: delete the sentence that reports the chrysalization. I can still end that scene in a way that will make readers want to find out whether what Amanda fears will happen to her or not. (Hint: it–NO, I’m not telling!)

    My barber asked me yesterday if I ever forget what I’d written earlier in the draft. Heck, yeah! Happens all the time. Having an outline helps but there are always details about something I wrote months ago that get forgotten or contradicted later. Maybe other writers can keep all of that straight but in a 110,000+ word draft, written over the course of six or seven months, for me, fuhgeddaboudit.

    This is just one reason why first drafts should never ever be final drafts!

    I still need to go though the draft and sort out the timeline. That’s especially important this time because the final scene has to take place in May or June. And since the book opens at a specific time of year, right after the end of Chrysalis, everything else needs to happen at the right time or the last scene could end up in some other month, when the weather pattern that’s critical to the end of the story doesn’t happen, or doesn’t happen so much, in Dallas. (That’s a teaser.)

    I’m actually looking forward to getting started on Draft 2. I know lots of writers who dislike, hate, despise, you pick the negative verb, revising. Not me. I enjoy it. While it’s a different kind of process, and takes a different kind of creativity than writing that first draft is/does, seeing the work get better is a reward in itself. I get a real feeling of satisfaction at the end of a day of editing when I know the story is better than it was before I started.

    Draft 2 is what my writers’ group will get. (Get ready, guys and gals. When it starts to come your way, it’s going to come in big chunks!) Their feedback will help me create Draft 3, which is what I plan to send to my still-to-be-selected editor and beta readers. Draft 4, created from their feedback, should be what goes to CreateSpace and Smashwords to be published.

    When will that be? I don’t know. I’d hoped to get this book done and out by the end of this year, but I don’t see that happening now. If nothing else, since I don’t know who’s going to edit the book, I don’t know what his or her timeline will be: when they’ll be able to take it, how long they’ll need, etc. All in good time. Things are moving forward, and that’s what matters.

    Time to get busy.

  • Tile, (Counter) Tops, and Tight Fits

    The work on the interior “fittings,” if you will, of the house is now underway in earnest. With the cabinets installed in the pantry, kitchen, and bathrooms, one of the next steps is to “template” the counter tops. “Templating” means getting their exact–and I do mean exact–measurements. As George, the installer said, if they get them just wrong, a thousand-dollar slab of granite is ruined and his company ends up doing the job “for free.” Well, not free, exactly, but they don’t make any money on it. This is definitely a “measure twice (or three or four times, cut once” kind of job.

    So with interior designer Edith supervising…

    Edith supervises

    …and George measuring down to the 32nd of an inch…

    George measuring

    …I was, um, supervising. Yeah, supervising! That’s it! (OK, and taking pictures. And making “do this/do that” decisions when necessary.)

    This week I’ll be heading down to the two suppliers of the granite slabs we’ll be using to select new ones, since the ones we’d selected originally have been sold.

    The kitchen and pantry will be a bit different, since the material we’ll be using there–a combination of crushed white quartz, recycled clear, gray, and blue glass pieces, and binder that goes by the brand name Curava ® Arctic Blue–will be molded based on the templating George did. Still, it’s just as critical to get those dimensions right. Edith brought along the different kinds of tile that are going to go on the kitchen walls so we could see them in place for the first time. That’s a piece of the Curava in front of the others.

    Kitchen tiles

    The photo doesn’t give any sense at all of what the walls will look like, other than how the colors will work together. Stay tuned for further developments!

    While we’re on the topic of colors and tiles, this was the first time Edith and I had a chance to see what some of the accent tile in the guest bath was going to look like when paired with the dark green cabinets there.

    Green bath cabinets and tile

    It’ll be easier to get a sense of how it all fits together once the counter top and other wall tile go in, but we both think those grays and browns are going to work well with the cabinets.

    This is all pretty exciting–OK, it’s exciting to me–but another big step forward this week was the laying of the first tile on the floor, specifically the floor of what will be the “Oriental” bedroom. Tile-setter Kurtis is the best in the business in the area, and here he is at work.

    OK, it wasn’t exactly the same kind of “magic moment” that The Drifters were singing about in the background, but it’s a pretty big deal anyway.

    And speaking of big, the bookcase cabinets are going in in the office.

    Office bookcases

    That trim piece around them needs to be just right, and of course the walls aren’t perfectly straight, so whenever the frame is just a little bit off…

    Bookcase trim

    like it is at the upper left corner, the guys have to take it out onto the patio, trim it a little, bring it back in, check to see if that was enough, and if not, do it again. No problem, right? Well, it just barely fits through the door onto the patio.

    Tight squeeze

    Part of the credenza/bookcase that will be behind my desk is in, too.

    Office credenza

    But there are more cabinets to go in.

    More boxes

    Part of the cabinetry for the great room entertainment center is in as well.

    Great room entertainment center

    So now, more and more, the interior is beginning to fill in and become something more than just open spaces.